Step 4Design and permit
1) make a preliminary design, a drawing. Find out what more to obtain, plus alternatives.
2) Check out the building codes and rules of your place: submit, in a casual way, the design to the board, the authority which has to approve construction (in my case, the allotment board).
3) Discuss and modify problems in he design. When everything is OK, submit the corrected design. Get the approval!, in writing!!!
Forget to take this step? prepare to rebuild!!!!
My first greenhouse was built without approval. I had to take it down!!!
Check if you can build!!!