Step 2: Construction
Attach 22-inch-long pipe to the 1½-inch male pipe thread adapter using PVC cement.
Attach 1½-inch female adapter to 1½-inch to 3/4-inch reducing bushing using PVC cement and allow to cure.
Screw male pipe thread adapter assembly to female pipe thread adapter assembly carefully.
Drill hole in one 3-inch end cap the diameter of the tire valve. Insert the tire valve into the cap.
Attach both 3-inch end caps to 3-inch diameter pipe with PVC cement.
Use solvent weld to attach the 3-inch pipes to the tee connector.
Take the second reducing bushing and attach the 1½-inch opening to the tee connector with PVC cement.
Wrap the heads of the 3/4-inc pipe nipples using Teflon pipe tape.
Insert the nipples into the ball valve (or as it has been suggested the pneumatically modded sprinkler valve).
Screw the ball valve-pipe nipple into the 22-inch barrel.
Screw the new barrel assembly into the pressure chamber.
Allow to cure overnight.
Wrap the pressure reservoir with three layers of duct tape. (optional)
Remove these ads by
Signing Up





















Not Nice






















Visit Our Store »
Go Pro Today »



