Instructables

Altoids Tin Stove w/ Pot Rest

Featured

Step 3: Mark & drill 2 holes

Picture of mark & drill 2 holes
Next determine center lengthwise on your 2 strips of flashing, measure 1/2" each direction and mark for drilling.These holes are for the 2 pop-rivets that will hold the strips together. I suggest drilling them together as I did, it will help insure alignment of the holes.
 
Remove these adsRemove these ads by Signing Up
orsd2 months ago
The best way is to clamp it down... Using gloves with drills is a big no no bec ause you glove may get caught
Pro

Get More Out of Instructables

Already have an Account?

close

PDF Downloads
As a Pro member, you will gain access to download any Instructable in the PDF format. You also have the ability to customize your PDF download.

Upgrade to Pro today!