Introduction: Blizard 1.0 a K'nex Ball Machine in Progress

This ball machine so far has:

1 Lift (connected arm lift.)

1 Uncompleted path.

Special thanks to SandroKnexMaster for the lift!!!

Step 1: Video

Here is the video of it so far. Enjoy.

And...

Like

Follow

Comment

Comments

author
Knex2thelimit (author)2015-06-23

Looks good so far! However, I think j have seen that path; it may have already been used. I might be wrong though. Can't wait to see it when it's finished!

author
knex akbar (author)Knex2thelimit2015-06-24

this path is a less piece-consuming version of a path used in obligation by toeti. the only difference is that this does not have a roof.

author
autumsawesome (author)knex akbar2015-06-24

Oh I didn't know that thanks for telling me I will fix it right away.

author
knex akbar (author)autumsawesome2015-06-25

no problem, pretty much every possible path has already been invented, the odds of reinventing one is quite big.

also your machine is looking good so far, very piece efficient. :)

author
sandroknexmaster (author)2015-06-24

Looks good :)

author
Fission_Chips (author)2015-06-22

Wow! This looks incredible. I could never build something this complex with K'Nex.

author

Thanks.
Just so you know I used instructions for the lift.

author
master-splinter306 (author)2015-06-23

Awesome sauce Yah! It is awesome!

About This Instructable

125views

1favorite

License:

Bio: Hello everyone, I am autumsawesome. I mostly post Instructables on K'nex and occasionally I will post some completely different Instructable like on how to ... More »
More by autumsawesome:Crépe Style OmeletteThe Most Waterproof Tape ExperimentHow to Make Apricot Jam
Add instructable to: