Building the GEK Gasifier in seven parts

 by jimmason

Step 8: Gas cowling - 6

picture-7.jpg
Fully weld all tacked joints

  • Stitch weld in short sections to prevent warpage. But make sure to fully seal all joints
  • Weld ONLY on the underside of the flange ring. No welding on the top joint side of the flange
  • Be careful to not warp the top flange when welding the gas outlet into place
  • Grind top surface of flange flat after welding
  • Clean up flange holes with a 11/32" drill
 
Remove these adsRemove these ads by Signing Up
Pro

Get More Out of Instructables

Already have an Account?

close

PDF Downloads
As a Pro member, you will gain access to download any Instructable in the PDF format. You also have the ability to customize your PDF download.

Upgrade to Pro today!