Step 3Assembling the water collection pipes
You will need to make sure there is lots of adhesive on them and they are well sealed because there is quite a lot of pressure in the bottom of the pipes.
Then I drilled another 40mm hole in the top of one of the pipes so I could fit an overflow pipe.
Next I glued the screw on inspection end cap in the end of one of the tubes.
While the adhesive was drying I made up the cut off switch mechanism.
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|









































