Remove these ads by
Signing UpStep 1: CAD/CAM
I did the CAM setup in CAMworks. This was divided into a rough area clearance, a z-level, and a constant stepover finishing pass. I chose to do the rough clearance with a 1/2" hogging end mill, the z-level with a 1/2" regular end mill, and the stepover with a 1/4" ball end mill.









































Visit Our Store »
Go Pro Today »




For the rest, good job on the model and the fabrication.