Step 15Lay up and cure of the remaining carbon layers
The total amount of basic layers is 7 (including the first 3). At the end piece there are 3 additional layers and at the boom head 6 additional layers, starting at the beginning of the bend and gradually building up to the boom head. The orientation of the layers is 0-90. Only at the end piece there is one layer at +/- 45 to counter shear forces. A cured layer is 0.3 mm thick with a fiber volume fraction of 50%.