Step 4Start Assembling
Start with the bottom of the processor. First attach a ball valve and work your way to where you'll put the pump.
TAPE EVERY CONNECTION
The three places you use the Tee joints are essentially identical, so I recommend assembling these before you put them on the rest of what you have. From the tee- connector-> Ball valve->Barbed adapter
Then it goes--Ball valve-> Connector-> Tee joint (assembled)-> connector-> Ball valve-> Connector-> Tee joint (assembled)-> Connector-> Union-> Connector-> Reducer coupling-> 1" Connector-> Pump-> (now heading up)-> 1" Connector-> Reducer coupling-> Connector-> Union-> connector-> Tee Joint (assembled)-> Connector-> Ball Valve-> Pipe (length depends on how tall the processor is)-> 90 degree elbow-> Pipe back to processor (again, the length depends on how far it is to the processor)-> Malleable coupling-> and you're back!
Be sure to have the unions disconnected when you assemble the upper part, then connect them again to put the pump back on.
This is a good point to start thinking of what to mount it on, and where. Keep in mind you need a place to drain glycerin below the processor, so you'll need it raised some.
The last piece to assemble is the carboy lid. Drill a hole where you're supposed to and screw in the connector. Onto this, add a ball valve and the fourth hose adapter.
Be sure that your carboy has a vent behind the handle, and be sure this vent is drilled out.
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|
























































