Step 5Side finishings
Then it was disassembled again and the contours of the side boards were covered with bolted rubber strip at intervals of 5cm.
At this time the stand had been built also - it received the same rubber treatment.
Everything was assembled again to test fit without monitor and core system
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|













































