Step 5Creating the Air Cannon
The cannon uses air pressure stored in the air reserve tank , and pressurized by an electric solenoid quick release valve this valve releases after the completion of 2 circuit switches located under the air reserve tank.
The first switch will "arm" the cannon, a green LED will indicate this
The second switch will "fire" the cannon, a red LED will indicate this as well as the cannon firing
*Refer to pictures number 1, 5, and 6 for a reference
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|

















































