Instructables
loading
loading

My SEP /// SEGV-3 (Shell Ejecting Pistol /// Shell Ejecting Gun Version 3)

Step 5: Assembly and rubberbands

Picture of assembly and rubberbands
P1030274.JPG
P1030275.JPG
P1030276.JPG
P1030277.JPG
P1030278.JPG
P1030279.JPG
P1030280.JPG
P1030281.JPG
P1030282.JPG
P1030284.JPG

 
Remove these adsRemove these ads by Signing Up