Step 8Putting it all together
Next, cut the cord off of your cell-phone charger and split and strip the ends. Pass the cord through the back hole of the shoe and connect the charger wires to the generator wires. Finally, wrap the exposed part of the wires in electrical tape.
Now for the spring. Drill a hole on each side of the shoe, about where the holes in the towers are. Now pass a wire through the shoe, back block, and spring assembly. Then cut the wire on each side to about 1" and just fold it over.
All that is left now is connecting the rest of the lever.
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|



















































