Instructables

Rave Rover - Mobile Dance Stage

FeaturedContest Winner

Step 6: Adding the Frame

Picture of Adding the Frame
%255BUNSET%255D-4.jpg
%255BUNSET%255D-3.jpg
Once the LED modules are all planted on the bottom panel, it's time to over lay the cut frames to set up the light 'boxes' or 'pixels'. The holes in the bottom panel (and top panel) allowed us to be able to screw the top and bottom overlays to the rails themselves, and make the entire structure much more solid and to keep it from sliding apart.

You can see how the slots in the rails we cut out are perfect for running the wires between the boxes.

 
Remove these adsRemove these ads by Signing Up