Step 3Dig
Our project has been done in 30-40 foot pieces, but since there was a backhoe involved most of the trench was dug at the same time. If you're digging by hand you might want to dig the trench as it is needed since rain can ruin all you good work very quickly.
Stack the buckets (for tall walls it is easier to create the stacks in the trench) then tamp the soil back into place. Since this wall is ~7 feet tall, 1/2" rebar (reinforcing bar) was wired to the stacks horizontally to align them.
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|