loading

Step 3: Gass connections

We split pipe into 3 drilled 2 large holes between connections. We then welded in gas connections to bottom of pipe and connected using gas fitting and a T junction back to gas bottle.

Reason for having two inlets in pipe was to improve on spread with filling up pipe with gas.