Step 3Marking and drilling holes
The diagram in picture 1 should illustrate this well. Picture 2 is the same diagram rotated to give a better impression of how the finished stand should look.
I used a scorer (correct name please?) to mark a faint line which left a 40mm seperation between the holes once marked, then marked along these lines the positions of the holes.
There are further pictures to illustrate the process I undertook to mark and drill the holes. The 5mm holes are where the threaded steel rods are slid through, the 3mm holes are pilot holes to allow you to screw the feet of the stand to the inside of the uprights. The 3mm holes go all the way through the feet and part way through the uprights.
Please note: I left an "X" off my diagram, picture one has a comment to show you where an additional steel bar should go.
| « Previous Step | Download PDFView All Steps | Next Step » |
![]() |
Add Comment
|































![Build a tv rack with an ikea lack table [ aka lackrack ]](http://img.instructables.com/files/deriv/F3B/1PYD/GD2J2WCW/F3B1PYDGD2J2WCW.SQUARE.jpg)



















