I put on of the nylon cogs on the shaft for the blades on the back of the motor housing. The other cog I put on the shaft of the sewing machine motor.
I built a base out of oak and routed a decorative edge on the pieces. I cut out a smaller base for the motor, and painted some "L" brackets brass to mount the motor to it. Trial and Error got me the correct length for the chain, as I gradually pieced parts together. I also added the braided water supply line, which is purely decorative.
I ran the power wire for the motor through the top of the wooden fan base. It plugs into the router speed control, which is mounted under the wooden base. The speed control, is then plugged into the wall.
I stained the base and applied a sealant. When done, I mounted the clock feet, which I had painted gold. Then I started test fitting parts together for final assembly.