Step 8Further order of operations
Here's the plan for the next week or so (I'd like to hear thoughts):
(0) get wood for the base ends and make 'em
(1/2) put the small additions onto the main support as per the plans
(1) drill axle holes in main support; fix the possible alignment problem by assembling both of the main supports, putting the axle through them, leveling/squaring everything, and then drilling the bolt holes for the top piece's connection to the rest of the main support
(2) continue refining model
| « Previous Step | Download PDFView All Steps | Next Step » |
3
comments
|
Add Comment
|
![]() |
Add Comment
|














































