UV LED Exposure Box

Step 5Fit, Fill, Sand and Drill

Fit, Fill, Sand and Drill
«
  • UV-BoxApron.jpg
  • ApronFitted.jpg
  • Lid Closed.jpg
  • Lids Fitted down.jpg
  • Lids Fitted.jpg
  • Hinges Closed.jpg
  • Hinges Open.jpg
  • Catch.jpg
  • last photo ←
»
Fit the lid, hinges, catches and glue the apron and support in place. This step will require a lot of test and adjustment to get things just right. Pay particular attention to the glass lid. I've slotted the holes for the glass lid hinges to make for easy adjustment. I've also chosen some hinges that only open to 95 degrees and some toggle catches.
« Previous StepDownload PDFView All StepsNext Step »

Pro

Get More Out of Instructables

Already have an Account?

close

All Steps Viewing
View all steps of an Instructable on the same page when you're a Pro Member.

Upgrade to Pro today!
25
Followers
1
Author:djhamer