Step 2: Dry fitting the forms

1. Take the 1 and 1/2 inch bolts and gently push them into the six marked locations within the circle.
2. Place the smaller rotor form in its groove.
3. Place the larger stator form in its groove.
is't this like<sub> a de-sheller?</sub><br/>
I am curious as to how you constructed the metering plates.. I don't find much on the original site and no mention at all on yours. Thanks for sharing!
I personally don't use one on my sheller. I did round the rotor at the top with cement so the nuts will fall into the sheller. I will be using a hopper and auger setup to feed mine so a metering plate is not needed.