Step 9Final Assembly
The assembly followed what was described in step 7:
1. Pipe was placed in footer flanges
2. Bottom shelf flanges were slid on
3. Bottom shelf was put in place, roughly where I wanted it
4. Middle shelf flanges were slid on
5. Middle shelf was put in place, roughly where I wanted it
6. Top shelf flanges were slid on
7. Top shelf was put in place, roughly where I wanted it
8. Header was put in place, the unit was clamped lightly
9. Final adjustments were made to the placement of the header and footer, so the pipes are straight
10. Final hight and level adjustments were made to each shelf, make sure the set screws are TIGHT
11. Clamped the shelf tighter in place, it's not moving, don't make it too tight
12. Flanges were attached to the shelves with 3/4" screws
It might seem like a lot but it's very simple and fast. I emphasize the order because I found it was the easiest way.
If you really want it here is the SketchUp file is attached.