Tower Crane

1,105

3

2

Posted

Introduction: Tower Crane

Our assignment “” was aimed at training our teamwork and practice ability. After a term’s hard working, the “” was successfully designed and working under control though it failed   accomplishing the command because the battery was not powerful enough to lift the weight. At first, we focus too much on the stability, so we used illegal materials which made waste of money and materials. After the failure attempt of the first generation “”, the second generation of “” was successful. However, we used too much material and disobeyed the economic engineering principle. In the process, our team worked days and nights and firm friendship was built, though members have been low in passion and even had argument. Though our work was not perfect, we are proud of it!

Share

Recommendations

  • Epilog Challenge 9

    Epilog Challenge 9
  • Gluten Free Challenge

    Gluten Free Challenge
  • First Time Author Contest 2018

    First Time Author Contest 2018
user

We have a be nice policy.
Please be positive and constructive.

Tips

Questions

2 Comments

Looks like you've got some quotation marks to fill.

Cool build! What class was this for?