Basement Workshoppe

Introduction: Basement Workshoppe

I live in a flood zone, and have to be prepared for water seeping up through the basement floor. When I built my workbench, I put the legs in 5 gallon plastic buckets for protection and trash. 

Share Your Space Challenge

Participated in the
Share Your Space Challenge

Be the First to Share

    Recommendations

    • Digital Fabrication Student Design Challenge

      Digital Fabrication Student Design Challenge
    • Make It Modular: Student Design Challenge

      Make It Modular: Student Design Challenge
    • Science Fair Challenge

      Science Fair Challenge

    3 Comments

    0
    joshua.artist
    joshua.artist

    5 years ago

    Freakin Genius!! No trash for me but storage, dowels, pry bars, etc. My basement leaks too.

    0
    notimeoff
    notimeoff

    10 years ago on Introduction

    Ok ....5 gallon buckets for trash but under the legs ? how do you empty them.
    I put a hook on the end so the bucket is half under the bench and mark the top....brush between the lines ...into the bucket and lift off the hook and into the outside can. but that's just me :-)