Introduction: How to Install Pavers


 
STEP 1: Excavation and Compaction – 8-9 inches

STEP 2: Geotextile Layer Installation (where applicable)

STEP 3: Base Installation – 4-6 inches

STEP 4: Drainage System Installation (where applicable)

STEP 5: Compaction Base Added

STEP 6: Wash Bedding Sand installation – 1-2 inches

STEP 7: Paver Stone Installation

STEP 8: Paver Compaction and Setting

STEP 9: Polymeric Epoxy Sand Installation

STEP 10: Newly Installed Stones are Cleaned

STEP 11: Sealer Application (recommended)

STEP 12: Final Inspection and Approval