Introduction: Luxurious Outdoor Shower - Part 1 [Natural Stone & Tiling]

About: Hello there! Thanks for stopping by! I'm Elias and I'm addicted to Making, Building and Creating any kind of things, producing free DIY videos and showing you How it's done, step by step! Here you can see some…

This is the 1st part of a Luxurious Outdoor Shower and in this instructable you'll see: How I installed the "Natural Stone" and the "Tiles". The length of the shower is 200cm & the width 100cm.

Step 1:

Firstly, for the mortar, add sand, cement, a little lime and water.

Step 2:

Then, with a plaster mixer, mix well, until all ingredients become one single mixture.

Step 3:

Once you have designed, with a marker, the limits of the shower on the floor, place the concrete blocks one by one.

Step 4:

Leave a gap at some point to lead there the water from the shower.

Step 5:

When you finish, let it dry for one day.

Step 6:

Wash the natural stones, on both sides, so that they can be placed securely on the mortar.

Step 7:

Place the stones one by one and give them a slight slope towards the point where we have made the gap.

Step 8:

When you finish, let it dry for one day.

Step 9:

Mix the grout, a little cement and a little sand, with water...

Step 10:

...to put it between the stones.

Step 11:

When you finish, let it dry for a while.

Step 12:

Now take a putty knife and remove the grout that there is on the stones.

Step 13:

Drag a wet sponge across the whole surface very softly, so the grout and the stone to be at the same level.

Step 14:

Repeat the same process several times until it is completely clean.

Step 15:

For the tiling, first place the ones on the side and then the ones on the top of the concrete blocks.

Step 16:

After you have sprinkled water on the concrete blocks, evenly spread with a plastering trowel with teeth the tile glue.

Step 17:

Before you place the tile, dip it in water and then press it until it is aligned with the others.

Step 18:

Let approximately one cm between them so that we can place the grout later.

Step 19:

When you finish, let it dry for one day.

Step 20:

Place the grout with a putty knife and press well to fill all the gaps.

Step 21:

After a while, take a wet sponge and clean the gaps very smoothly.

Repeat the same process several times until it is completely clean.

Step 22:

Let it dry for one day and then wash the whole construction very well.

Step 23:

At the end paint the stone and the grout with a stone varnish.

Step 24:

Thanks for reading & I hope you liked it!