Preview of Project Dysprosium

Introduction: Preview of Project Dysprosium

About: ~commenters~ 100=knexgunbuilder 200=Mr.Muggle 300= ~subscribers~ 10=Visper123

 this ball machine will be done in about 3-4 months. im planning to have 15 or more paths and 6 or more lifts. it will be about 8-9 feet when finished. I believe this will be one of the biggest ball machines ever.

Be the First to Share

    Recommendations

    • Game Design: Student Design Challenge

      Game Design: Student Design Challenge
    • Make It Bridge

      Make It Bridge
    • Big and Small Contest

      Big and Small Contest

    14 Comments

    0
    Tornado96
    Tornado96

    12 years ago on Introduction

    Great ball machine. I'm looking forward to more.
    And i'm not sure the element in the last picture is new. It seems familiar somehow.

    0
    shadowninja31
    shadowninja31

    Reply 12 years ago on Introduction

    I know, but you said it oh.... it will be. I see now.

    0
    coolknexcreations
    coolknexcreations

    Reply 12 years ago on Introduction

    yeah. everybody makes mistakes. :) (i acidentally bumped it over and had to connect almost everything back.)

    0
    Mr. Muggle
    Mr. Muggle

    12 years ago on Introduction

    I like the elements! Is that ferris wheel a lift or an element?

    0
    coolknexcreations
    coolknexcreations

    Reply 12 years ago on Introduction

    The big ferris wheel is an element. I am working on a ferris wheel lift though.

    0
    ~KGB~
    ~KGB~

    12 years ago on Introduction

    epic! 5* ps, read my newest topic......