Assignment B-Restock by Jamie + Joy

1.0K112

Intro: Assignment B-Restock by Jamie + Joy

Graphic showing number of pieces, size and assembly summary

STEP 1: Prepare Waterjet Pieces

Prepare digital file for water jetting joint pieces with vector software.

STEP 2: Joint

Assemble water jet joints with the interlocking pieces

STEP 3: Assemble Joints With Steel Members

Assemble joints with 24", 90 degree cut 1" steel stock and might weld. Grind when welds are done until you achieve desired texture.

STEP 4: Assembly

Assemble all parts to form the cube.

Comments