Introduction: How to Make a Forklift With Makeblock

About: Makeblock was founded in 2012 as the world's first open-source robot and programing platform. With more than 400 mechanical components, electronic modules, and software tools, we are determined to bring meanin…

This is one form of Makeblock. Ultimate Robot Kit With mechanical parts and electronic modules provided in this kit, you could add different transformation to your robots.

Step 1: Assemble Base Platform

Parts list:

2 x Beam 0824-144

3 x Beam 0824-96

1 x Bracket 3x6

1 x Plate 3x6

13 x Screw M4x14

4 x Screw M4x8

6 x Nut M4

Step 2: Install Wheels and Motors

Parts list:

2 x Timing Pulley 90T

2 x Shaft Connector 4mm

2 x Tire 68.5x22mm

2 x DC Motor-25 Bracket

2 x DC Motor-25

8 x Screw M4x14

4 x Screw M3x8

4 x Headless Set Screw M3x5

Step 3: Install Another Two Wheels

Parts list:

2 x Timing Pulley 90T

2 x Tire 68.5x22mm

2 x Threaded Shaft 4x39mm

4 x Flange Bearing 4x8x3mm

2 x Nut M4 2 x Shaft Collar 4mm

6 x Plastic Ring 4x7x2mm

2 x Headless Set Screw M3x5

Step 4: Install Lifting Fork

Parts list:

1 x Beam 0808-184

1 x Plate 3x6

8 x Plastic Ring 4x7x2mm

2 x Screw M4x8

4 x Screw M4x22

4 x Nut M4

Step 5: Assemble Lifting Fork

Parts list:

2 x Beam 0808-88

3 x Link Rod

2 x Bracket 3x3

2 x Timing Belt Connector

2 x Bracket 3x6

1 x Timing Belt 240MXL

2 x Screw M4x22

2 x Screw M4x14

14 x Screw M4x8

12 x Nut M4

Step 6: Install Lifting Frame

Parts list:

2 x Beam 0808-184

4 x Threaded Shaft 4x39mm

2 x Nylon Pulley with Bearing

4 x Bearing 4x8x3mm

4 x Screw M4x14

10 x Plastic Ring 4x7x2mm

Step 7: Install Timing Pulley

Parts list:

1 x D Shaft 4x56

1 x Timing Pulley 18T

2 x Shaft Collar 4mm

3 x Headless Set Screw M3x5

Step 8: Install DC Motor

Parts list:

1 x Beam0808-88

1 x Link Rod

1 x DC Motor-37 Bracket

1 x Timing Pulley 62T

1 x DC Motor-37

1 x Shaft Connector 4mm

2 x Screw M4x14

6 x Screw M4x8

2 x Headless Set Screw M3x5

3 x Screw M3x8

Step 9: Adjust the Position of DC Motor to Tension the Timing Belt.

Step 10: Install Electric Modules

Parts list:

2 x Base Bracket

1 x Makeblock Orion

1 x Battery Holder for (6) AA

1 x Me Bluetooth Module

1 x Me Dual Motor Driver

9 x Screw M4x14

2 x Screw M4x8

11 x Nut M4

Step 11: Wiring

Parts list:

1 x RJ25 Cable-20cm

1 x RJ25 Cable-35cm

3 x Motor Cable

3 x Terminal Block

3 x Ferrite Ring

Step 12: Connect DC Motor-37 With Me Dual Motor Driver.

Step 13: Plug Dual Motor Driver and Bluetooth Module Into Port 2 and Port 5 Respectively.

Connect Battery Holder with Orion board.

Step 14: The Finished Forklift