Knex Ball Machine Copper
Intro: Knex Ball Machine Copper
Hi guys.
Welcome to my newest ball machine copper. Sorry about some of the grainy pictures, I was building it in my basement. (which I will never do again) In my opinion the video turned out better than I had expected. Pictures 34 through 38 shows you how I modified the stepper lift to fit the newer balls. So I guess you could say it's a modified modified stepper lift. Anyway here are the details and some of the elements.
Welcome to my newest ball machine copper. Sorry about some of the grainy pictures, I was building it in my basement. (which I will never do again) In my opinion the video turned out better than I had expected. Pictures 34 through 38 shows you how I modified the stepper lift to fit the newer balls. So I guess you could say it's a modified modified stepper lift. Anyway here are the details and some of the elements.
- networks - 3
- lifts - 5
- tracks - 12
- new elements (including new types) - 18
- height - aprox. 5'
- length - aprox. 6'
- depth - aprox. 3'
- pieces - not a clue
- building time - about 2 months
- Alternating arm lift - Shadowman39 and Tornado96
- Modified stepper lift - Shadowman39
- Stacker lift - bezempje95
- Conveyor belt (new type) Keggore1 (aka therealkeggore)
- The elliptica - I_am_Canadian
- The 2 ball ball arm - sathothy
- The two balls divider - sandroknexmaster
- panel stairs - nschmal1
22 Comments
www139 11 years ago
KneXtreme 11 years ago
www139 11 years ago
www139 11 years ago
www139 11 years ago
mikeasaurus 11 years ago
KneXtreme 11 years ago
Orangeprofessor 11 years ago
KneXtreme 11 years ago
Orangeprofessor 11 years ago
KneXtreme 11 years ago
jameshond 11 years ago
sandroknexmaster 11 years ago
I like that panel spiral stairs and the little square panels path.
KneXtreme 11 years ago
Shadowman39 11 years ago
KneXtreme 11 years ago
Tinribs 11 years ago
sathothy 11 years ago
KneXtreme 11 years ago
Sorunome 11 years ago
/me is speechless